| Company | Project | Region | Technology | Production (bbl/d) |
| Alberta Oilsands Inc. | Clearwater West | Athabasca | In-Situ | 15,000 | |
| | Regulatory Status Announced | Start Up 2013 | |
| Canadian Natural Resources Limited | Primrose and Wolf Lake | Cold Lake | In-Situ | 120,000 | |
| | Regulatory Status Producing | Start Up 1985 | |
| Chevron Canada Limited | Ells River | Athabasca | In-Situ | 35,000 | |
| | Regulatory Status Announced (Not Formalized) | Start Up TBA | |
| Connacher Oil and Gas | Great Divide Expansion Project | Athabasca | In-Situ | 24,000 | |
| | Regulatory Status Public Disclosure Made | Start Up 2014 | |
| Connacher Oil and Gas | Great Divide Pod 2 (Algar) | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Under Construction/Near Completion | Start Up 2010 | |
| ConocoPhillips Canada | Surmont Phase I | Athabasca | In-Situ | 27,000 | |
| | Regulatory Status Producing | Start Up 2007 | |
| ConocoPhillips Canada | Surmont Phase II | Athabasca | In-Situ | 83,000 | |
| | Regulatory Status Under Construction | Start Up 2015 | |
| Devon Canada Limited | Jackfish I | Athabasca | In-Situ | 35,000 | |
| | Regulatory Status Producing | Start Up 2007 | |
| Cenovus Energy Inc. | Christina Lake Ph. 1A, 1B | Athabasca | In-Situ | 18,800 | |
| | Regulatory Status Producing | Start Up 2002 | |
| Cenovus Energy Inc. | Christina Lake 1C | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status Under Construction | Start Up 2011 | |
| Cenovus Energy Inc. | Christina Lake 1D | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status ERCB Approved | Start Up 2013 | |
| Cenovus Energy Inc. | Christina Lake 1E-F-G | Athabasca | In-Situ | 120,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2013-2016 | |
| Enerplus Resource Fund | Kirby Phase 1 | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Regulatory Application Filed (Delayed) | Start Up TBD | |
| Grizzly Oil Sands | Algar Lake | Athabasca | In-Situ | 11,300 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2013 | |
| Husky Energy | Caribou Lake Demonstration Project | Cold Lake | In-Situ | 10,000 | |
| | Regulatory Status Approved | Start Up TBD | |
| Husky Energy | Sunrise Phases 1-3 | Athabasca | In-Situ | 200,000 | |
| | Regulatory Status ERCB Approved | Start Up 2014-2020 | |
| Husky Energy | Tucker Thermal Project | Cold Lake | In-Situ | 30,000 | |
| | Regulatory Status Producing | Start Up 2006 | |
| Ivanhoe Energy | Tamarack | Athabasca | In-Situ | 20,000 | |
| | Regulatory Status Announced | Start Up 2014 | |
| Japan Canada Oil Sands Limited | Hangingstone Pilot | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Producing | Start Up 1999 | |
| Japan Canada Oil Sands Limited | Hangingstone Phase 1 | Athabasca | In-Situ | 35,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2014 | |
| Laricina Energy | Germain Pilot | Athabasca | In-Situ | 5,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBD | |
| Laricina Energy | Saleski Phase 1 | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| MEG Energy Corp. | Christina Lake Phase 1A | Athabasca | In-Situ | 3,000 | |
| | Regulatory Status Producing | Start Up 2008 | |
| MEG Energy Corp. | Christina Lake Phase 2 | Athabasca | In-Situ | 22,000 | |
| | Regulatory Status Producing | Start Up 2009 | |
| MEG Energy Corp. | Christina Lake Phase 2B | Athabasca | In-Situ | 35,000 | |
| | Regulatory Status Approved | Start Up 2013 | |
| Nexen Inc. | Long Lake Phase III Upgrader | Athabasca | In-Situ | 72,000 | |
| | Regulatory Status ERCB Approved (Delayed) | Start Up TBD | |
| Suncor Energy Inc. | Fort Hills | Athabasca | Mining | 190,000 | |
| | Regulatory Status ERCB Approved (Delayed) | Start Up TBD | |
| Suncor Energy Inc. | Lewis Phase 1 | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status Public Disclosure Made | Start Up TBD | |
| Shell Canada Energy | Carmon Creek Phases 1 & 2 | Peace River | In-Situ | 80,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBD | |
| Shell Canada Energy | Shell Peace River (Pads 42&43) | Peace River | In-Situ | 0 | |
| | Regulatory Status Producing | Start Up NA | |
| Southern Pacific Resource Corp. | STP MacKay Project | Athabasca | In-Situ | 12,000 | |
| | Regulatory Status ERCB Approved | Start Up 2013 | |
| Statoil Canada Ltd. | Kai Kos Dehseh - Leismer Demo | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Under Construction | Start Up 2011 | |
| Suncor Energy Inc. | Firebag Phase III | Athabasca | In-Situ | 68,000 | |
| | Regulatory Status Under Construction | Start Up 2011 | |
| Suncor Energy Inc. | Firebag Phase IV - VI | Athabasca | In-Situ | 211,000 | |
| | Regulatory Status Under Construction | Start Up TBD | |
| Suncor Energy Inc. | Voyageur South Mine | Athabasca | Mining | 120,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBA | |
| Suncor Energy Inc. | Voyageur Upgrader | Athabasca | Mining | N/A | |
| | Regulatory Status Suspended/Under Construction | Start Up TBD | |
| Sunshine Oil Sands | West Ells Phases 1-3 | Athabasca | In-Situ | 50,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Syncrude Canada Ltd. | Aurora North | Athabasca | Mining | 215,000 | |
| | Regulatory Status Producing | Start Up 2001 | |
| Syncrude Canada Ltd. | Aurora South | Athabasca | Mining | 200,000 | |
| | Regulatory Status ERCB Approved | Start Up 2016-2019 | |
| Syncrude Canada Ltd. | Mildred Lake | Athabasca | Mining | 135,000 | |
| | Regulatory Status Producing | Start Up 1978 | |
| Total E&P | Joslyn North Mine | Athabasca | Mining | 100,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBA | |
| Total E&P | Joslyn South Mine | Athabasca | Mining | 100,000 | |
| | Regulatory Status Announced | Start Up TBA | |
| SilverBirch Energy/Teck | Equinox | Athabasca | Mining | 50,000 | |
| | Regulatory Status Public Disclosure Made | Start Up 2014 | |
| Canadian Natural Resources Limited | Horizon Phase I | Athabasca | Mining | 110,000 | |
| | Regulatory Status Producing | Start Up 2008 | |
| Canadian Natural Resources Limited | Horizon Phase 2&3: (Tranche 1) | Athabasca | Mining | 92,000 | |
| | Regulatory Status ERCB Approved | Start Up 2007 | |
| Canadian Natural Resources Limited | Horizon Phase 2/3: Tranche (2-4) | Athabasca | Mining | 140,000 | |
| | Regulatory Status Announced (Not Formalized) | Start Up TBD | |
| Shell Canada Energy | Jackpine Mines Phase IA Train I | Athabasca | Mining | 100,000 | |
| | Regulatory Status Under Construction | Start Up 2010 | |
| Shell Canada Energy | Jackpine Mines Phase IB - Train II | Athabasca | Mining | 100,000 | |
| | Regulatory Status Approved | Start Up 2014 | |
| Shell Canada Energy | Jackpine Mine Expansion | Athabasca | Mining | 100,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBA | |
| Imperial Oil | Kearl Phase I | Athabasca | Mining | 110,000 | |
| | Regulatory Status Under Construction | Start Up 2012 | |
| Imperial Oil | Kearl Phase III | Athabasca | Mining | 100,000 | |
| | Regulatory Status ERCB Approved | Start Up 2021 | |
| Imperial Oil | Kearl Phase II | Athabasca | Mining | 100,000 | |
| | Regulatory Status ERCB Approved | Start Up 2015 | |
| Petrobank Energy & Resources Ltd. | Whitesands - Pilot | Athabasca | In-Situ | 1,800 | |
| | Regulatory Status Producing | Start Up 2010 | |
| Value Creation | Halfway Cr. Demo | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2010 | |
| SilverBirch Energy/Teck | Frontier Phase 1 & 2 | Athabasca | Mining | 160,000 | |
| | Regulatory Status Public Disclosure Made | Start Up 2015-2017 | |
| Koch Exploration Canada | Gemini | Cold Lake | In-Situ | 10,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2012 | |
| Suncor Energy Inc. | Firebag Phases 1 & 2 & Cogeneration and Expansion | Athabasca | In-Situ | 93,000 | |
| | Regulatory Status Producing | Start Up 2004-2007 | |
| Canadian Natural Resources Limited | Leismer Phase 1 | Athabasca | In-Situ | 30,000 | |
| | Regulatory Status Announced | Start Up 2020 | |
| Athabasca Oil Sands Corp. | MacKay River Pilot | Athabasca | In-Situ | 2,200 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2010 | |
| Athabasca Oil Sands Corp. | MacKay River Commercial Project Ph. 1-4 | Athabasca | In-Situ | 140,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2014-2022 | |
| Athabasca Oil Sands Corp. | Dover Central Pilot | Athabasca | In-Situ | 2,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up N/A | |
| Athabasca Oil Sands Corp. | Dover Commercial Phases 1-4 | Athabasca | In-Situ | 140,000 | |
| | Regulatory Status Public Disclosure Made | Start Up 2016-2024 | |
| BlackPearl Resources Inc. | Blackrod Pilot | Athabasca | In-Situ | 500 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2011 | |
| Canadian Natural Resources Limited | Kirby | Athabasca | In-Situ | 45,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2013 | |
| Canadian Natural Resources Limited | Birch Mountain East | Athabasca | In-Situ | 60,000 | |
| | Regulatory Status Announced | Start Up 2016 | |
| Canadian Natural Resources Limited | Gregoire Lake Phase 1 | Athabasca | In-Situ | 60,000 | |
| | Regulatory Status Announced | Start Up 2018 | |
| Connacher Oil and Gas | Great Divide Pod One | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Producing | Start Up 2007 | |
| Devon Canada Limited | Jackfish 2 | Athabasca | In-Situ | 35,000 | |
| | Regulatory Status Under Construction | Start Up 2011 | |
| Cenovus Energy Inc. | Borealis Phase 1 | Athabasca | In-Situ | 35,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBD | |
| Cenovus Energy Inc. | Borealis Phase 2 & 3 | Athabasca | In-Situ | 65,000 | |
| | Regulatory Status Public Disclosure Made | Start Up TBD | |
| Cenovus Energy Inc. | Narrows Lake Phases 1-3 | Athabasca | In-Situ | 130,000 | |
| | Regulatory Status Public Disclosure Made | Start Up TBD | |
| Enerplus Resource Fund | Kirby Phase 2 | Athabasca | In-Situ | 25,000 | |
| | Regulatory Status Announced (Not Formalized) | Start Up TBD | |
| E-T Energy | Poplar Creek ET-DSP Project Expansion | Athabasca | In-Situ | 100,000 | |
| | Regulatory Status Announced | Start Up 2014 | |
| E-T Energy | Poplar Creek ET-DSP Project | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2011 | |
| Excelsior Energy | Hangingstone Build out 1-3 | Athabasca | In-Situ | 80,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Excelsior Energy | Hangingstone Experimental Pilot | Athabasca | In-Situ | 1,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2011 | |
| Imperial Oil | Cold Lake Phases 1-10:Leming, Maskwa, Mahihkan | Cold Lake | In-Situ | 110,000 | |
| | Regulatory Status Producing | Start Up 1985 | |
| Imperial Oil | Cold Lake Phases 11-13:Mahkeses | Cold Lake | In-Situ | 30,000 | |
| | Regulatory Status Producing | Start Up 2003 | |
| Shell Canada Energy | Orion Phase 1 | Cold Lake | In-Situ | 10,000 | |
| | Regulatory Status Producing | Start Up 2008 | |
| Imperial Oil | Cold Lake Phases 14-16:Nabiye, Mahihkan North | Cold Lake | In-Situ | 30,000 | |
| | Regulatory Status Approved | Start Up TBD | |
| Korea National Oil Corporation | Black Gold | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2012 | |
| Korea National Oil Corporation | Black Gold Phase 2 | Athabasca | In-Situ | 20,000 | |
| | Regulatory Status Announced | Start Up 2015 | |
| Laricina Energy | Germain Phase 1 | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Laricina Energy | Saleski In Situ - Carbonate SAGD Demonstration | Athabasca | In-Situ | 1,800 | |
| | Regulatory Status Under Construction | Start Up 2010 | |
| MEG Energy Corp. | Christina Lake Phase 3C | Athabasca | In-Situ | 50,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2018 | |
| MEG Energy Corp. | Christina Lake Phase 3A | Athabasca | In-Situ | 75,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2014 | |
| MEG Energy Corp. | Christina Lake Phase 3B | Athabasca | In-Situ | 50,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2017 | |
| Nexen Inc. | Long Lake Phase II (Kinosis) | Athabasca | In-Situ | 72,000 | |
| | Regulatory Status ERCB Approved | Start Up TBD | |
| Nexen Inc. | Long Lake Phase I | Athabasca | In-Situ | 72,000 | |
| | Regulatory Status Producing | Start Up 2008 | |
| Nexen Inc. | Long Lake Phases 4-6 | Athabasca | In-Situ | 216,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| North Peace Energy | Red Earth CSS Pilot | Peace River | In-Situ | 1,000 | |
| | Regulatory Status Producing | Start Up 2009 | |
| North Peace Energy | Red Earth Expansion | Peace River | In-Situ | 3,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Osum Oil Sands Corp | Taiga | Cold Lake | In-Situ | 35,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2014 | |
| Petrobank Energy & Resources Ltd. | May River Expansion | Athabasca | In-Situ | 90,000 | |
| | Regulatory Status Public Disclosure Made | Start Up TBD | |
| Petrobank Energy & Resources Ltd. | May River Phase I | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2014 | |
| Petrobank Energy & Resources Ltd. | Whitesands-Expansion | Athabasca | In-Situ | 1,800 | |
| | Regulatory Status Approved | Start Up 2011 | |
| Pengrowth Energy Trust | Lindbergh Pilot | Cold Lake | In-Situ | 2,500 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBD | |
| Shell Canada Energy | Orion Phase 2 | Cold Lake | In-Situ | 10,000 | |
| | Regulatory Status ERCB Approved | Start Up TBD | |
| Suncor Energy Inc. | MacKay River Phase 2 | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status ERCB Approved (Delayed) | Start Up TBD | |
| Suncor Energy Inc. | MacKay River Phase 1 | Athabasca | In-Situ | 33,000 | |
| | Regulatory Status Producing | Start Up 2002 | |
| Statoil Canada Ltd. | Kai Kos Dehseh - Leismer Expansion | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2012-2014 | |
| Statoil Canada Ltd. | Kai Kos Dehseh - Commercial Project | Athabasca | In-Situ | 20,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2012-2034 | |
| Value Creation | Terre de Grace Pilot | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBD | |
| Value Creation | Terre de Grace Phases 1&2 | Athabasca | In-Situ | 80,000 | |
| | Regulatory Status Public Disclosure Made | Start Up TBD | |
| Canadian Natural Resources Limited | Grouse Phase 1 | Athabasca | In-Situ | 60,000 | |
| | Regulatory Status Announced | Start Up 2014 | |
| Cenovus Energy Inc. | Foster Creek Phases 1A-1E | Cold Lake | In-Situ | 120,000 | |
| | Regulatory Status Producing | Start Up 2001-2009 | |
| Cenovus Energy Inc. | Foster Creek Phases 1F,1G,1H | Cold Lake | In-Situ | 90,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2015-2017 | |
| Devon Canada Limited | Jackfish 3 | Athabasca | In-Situ | 35,000 | |
| | Regulatory Status Public Disclosure Made | Start Up 2015 | |
| Husky Energy | McMullen | Athabasca | In-Situ | 755 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBD | |
| Patch Energy | Ells River | Athabasca | In-Situ | 10,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Penn West Energy Trust | Seal Project | Peace River | In-Situ | 75 | |
| | Regulatory Status Regulatory Application Filed | Start Up TBD | |
| Suncor Energy Inc. | Chard | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status Announced | Start Up TBA | |
| Suncor Energy Inc. | Lewis Phase 2 | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Suncor Energy Inc. | Meadow Creek Phase 1 | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Suncor Energy Inc. | Meadow Creek Phase 2 | Athabasca | In-Situ | 40,000 | |
| | Regulatory Status Approved | Start Up TBD | |
| Sunshine Oil Sands | Harper Pilot | Athabasca | In-Situ | <1000 | |
| | Regulatory Status Approved | Start Up 2010 | |
| Sunshine Oil Sands | Legend Lake Phase 1-3 | Athabasca | In-Situ | 50,000 | |
| | Regulatory Status Announced | Start Up 2014 | |
| Suncor Energy Inc. | Base Plant, Steepbank Mine, Millennium | Athabasca | Mining | 350,000 | |
| | Regulatory Status Producing | Start Up 1967 | |
| Alberta Oilsands Inc. | Clearwater Pilot | Athabasca | In-Situ | 4,500 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2011 | |
| Sunshine Oil Sands | Thickwood Phases 1-4 | Athabasca | In-Situ | 50,000 | |
| | Regulatory Status Announced | Start Up TBD | |
| Andora Energy | Sawn Lake | Peace River | In-Situ | 700 | |
| | Regulatory Status Approved | Start Up N/A | |
| Shell Canada Energy | Pierre River Mine Phase 1 & 2 | Athabasca | Mining | 200,000 | |
| | Regulatory Status Regulatory Application Filed | Start Up 2018-2022 | |
| Suncor Energy Inc. | North Steepbank Mine Expansion | Athabasca | Mining | 180,000 | |
| | Regulatory Status Suspended/Under Construction | Start Up 2010 | |
| Shell Canada Energy | Muskeg River Phase 1 | Athabasca | Mining | 155,000 | |
| | Regulatory Status Producing | Start Up 2003 | |